Click on the buttons below to view some of the projects we’ve worked on recently. You’ll see from our case studies that we undertake all types of project, both large and small. We like to think of ourselves as a Mechanical Engineers best friend. When we’ve been commissioned on a project we do everything we can to ensure the job runs smoothly and is hassle free (for our clients at least!).

  • London Docklands Tower

    Rising to 450ft above Canary Wharf’s skyline and in our largest job to date at a value of over £2.7million, we have recently completed the installation of 43 no. Mitsubishi Electric water-cooled VRF type systems at Baltimore Tower. Carried out through RPM Services Ltd for Galliard Homes, we completed the installation of almost 900 indoor units, including the associated supply and return air grilles, ducts and plenums, to the Reception, all executive suites and 1-4 bedroom apartments from the Ground Floor through to Floor 43. The installation will be completed with the installation of independent LG air cooled mini VRF type systems in the 2 no. duplex Penthouses.
    • http://qualityac.co.uk/wp-content/uploads/2013/07/LON-DOC-TOWER.jpeg
    • http://qualityac.co.uk/wp-content/uploads/2013/09/Goodmans-Fields-Dusk-Image.jpg
    • http://qualityac.co.uk/wp-content/uploads/2013/09/Goodmans-Fields-Dusk-Image-1.jpg
  • Luxury Apartments

    The Chilterns is the ultimate for luxury living in the heart of London’s prestigious Marylebone. Working with the Axis Group for this £700,000 project, we supplied and installed 14 no. Daikin VRV-IV air cooled systems connected to 218 ceiling mounted ducted type units. The 44 apartments were designed to the highest technical specifications with the finest interiors from world-renowned designer Rabih Hage. This lead to unique issues and having to work very closely with all trades to ensure that the systems were installed to the designer’s very specific requirements.
    • http://qualityac.co.uk/wp-content/uploads/2013/07/LON-DOC-TOWER.jpeg
    • http://qualityac.co.uk/wp-content/uploads/2013/09/Sports-Centre-2.jpg
    • http://qualityac.co.uk/wp-content/uploads/2013/09/Lyon-Court-2.jpg
  • Student Accommodation

    We undertook this student accommodation project in Aldgate, London on behalf of A&J Ryan Mechanical Services. We supplied and installed 27 Mitsubishi Electric ‘R2’ heat recovery variable refrigerant flow (VRF) units and connected them to 781 indoor air conditioning units. The total project value was £1,535m and comprised 680 bedrooms/apartments and kitchen and ground floor communal areas. As always we took a proactive and problem-solving approach to ensure the project was delivered on time, and on budget.
    • http://qualityac.co.uk/wp-content/uploads/2013/07/MITSUBISHI-LOGO-NEW-copy.jpeg
    • http://qualityac.co.uk/wp-content/uploads/2013/09/Lyon-Court-1.jpg
    • http://qualityac.co.uk/wp-content/uploads/2013/09/Lyon-Court-2.jpg
  • New Build Apartments

    We supplied and installed 61 Daikin Altherma air to water low temperature heat pump systems at the prestigious Lyon Court Apartments in London Square. The system comprised one indoor hydro-box connected via refrigeration pipework and electrical control wiring to one condensing unit. The Daikin Altherma Heat Pump Systems are an alternative to conventional fossil fuel boilers. They’re built to optimise the clean, reliable and low maintenance characteristics of heat pump technology. Meaning they are eco-friendly and cost effective.
    • http://qualityac.co.uk/wp-content/uploads/2013/07/NEW-BUILD-APA-1.jpg
    • http://qualityac.co.uk/wp-content/uploads/2013/09/UCS-Image.jpg
    • http://qualityac.co.uk/wp-content/uploads/2013/07/11.jpg
  • University Sports Centre

    We were delighted to be instructed to install the air conditioning at the new sports centre at the University of Cambridge. We supplied and installed three Daikin two-pipe heat pump variable refrigerant volume (VRV) systems ranging from 150kW to 45kW. We also undertook the associated refrigeration pipework and electrical control wiring to serve the cooling coils on the Multipurpose Air Handling Units. In addition we also supplied and installed one Daikin three-pipe heat recovery VRV and connected to 7 indoor units. This project was for Kershaw Mechanical Services, and had a total project value of £88,000.
    • http://qualityac.co.uk/wp-content/uploads/2013/07/UNI-SPORTS-CENTRE-1.jpg

Our clients & End Users

Case Study Logo
Case Study Logo
Case Study Logo
Case Study Logo
Case Study Logo
Case Study Logo
Case Study Logo
Case Study Logo
Case Study Logo
Case Study Logo
Case Study Logo
Case Study Logo
Case Study Logo